945 Summer St is a newly available medical and professional building strategically located between Stamford Hospital and the Tully Health Center in downtown Stamford.
Space | Building | Available |
---|---|---|
Floor 1 | Lobby Only SF | Lobby Only SF |
Floor 2 | 4,544 SF | 0 SF |
Floor 3 | 4,544 SF | 0 SF |
Total | 9,838 SF | 0 SF |
BUILDING SPECIFICATIONS | ||
Number of Floors | 3 | |
Parking Spaces | 3/1000 sq. ft. | |
Floor Loading | 100 lbs./sq. ft. | |
Foundation | Concrete | |
Exterior | Glass, Steel, and Block | |
Roof | Rubber | |
HVAC | 6 Gas Fired HVAC units | |
Electrical System | 5 Services: 2x 3 Phase, 208 Volt, 400 Amp; and 3x 3 Phase, 208 Volt, 200 Amp | |
Generators | 0 | |
Elevators | 1 | |
Loading Docks | 0 | |
Fire Sprinkler System | No Sprinklers | |
Ceiling Height | Feet | Meters |
To Finished Ceiling | 8' 0" | 2.4 |
To Deck | 12' 0" | 3.7 |
To Under Steel | 12' 0" | 3.7 |